Network Upgrade Project on UQ Statushttps://status.its.uq.edu.au/affected/network-upgrade-project/Incident historygithub.com/cstateen2026-04-12T07:00:00+00:002026-04-12T07:00:00+00:00[Scheduled] Access switch upgrade in Cumbrae-Stewart (01-0072) TR 203Ahttps://status.its.uq.edu.au/issues/19907/Sun, 12 Apr 2026 07:00:00 +0000https://status.its.uq.edu.au/issues/19907/Scheduled for 2026-04-12 07:00:00 - 2026-04-12 22:00:00 ITS will be replacing 01-0072-203a-as02, 01-0072-203a-as03, 01-0072-203a-as04 with 2 x C9324 access switches in TR 203a. Resolution Network upgrade completed successfully (22:00 AEST — Apr 12)<p>Scheduled for 2026-04-12 07:00:00 - 2026-04-12 22:00:00</p> <ol> <li>ITS will be replacing 01-0072-203a-as02, 01-0072-203a-as03, 01-0072-203a-as04 with 2 x C9324 access switches in TR 203a.</li> </ol> <hr> <p><strong>Resolution</strong> Network upgrade completed successfully <span class="faded">(22:00 AEST — Apr 12)</span> </p>[Scheduled] Access switch upgrade in Cumbrae Stewart (01-0072) TR 124ahttps://status.its.uq.edu.au/issues/19888/Sun, 15 Mar 2026 07:00:00 +0000https://status.its.uq.edu.au/issues/19888/Scheduled for 2026-03-15 07:00:00 - 2026-03-15 22:00:00 ITS will be installing 2 x 9300-48UXM switches in Cumbrae Stewart (01-0072) TR 124a<p>Scheduled for 2026-03-15 07:00:00 - 2026-03-15 22:00:00</p> <p>ITS will be installing 2 x 9300-48UXM switches in Cumbrae Stewart (01-0072) TR 124a</p>[Scheduled] Access switch upgrade - Chaplaincy TR 111https://status.its.uq.edu.au/issues/19884/Sat, 07 Mar 2026 09:00:00 +0000https://status.its.uq.edu.au/issues/19884/Scheduled for 2026-03-07 09:00:00 - 2026-03-07 15:00:00 ITS will be replacing 01-0038-111-as01 (2 xC3750G-24PS), 01-0038-111-as02 (1 xC2960S-24PD) with 1 x 9300-48UXM access switches in TR 111. Connect new 01-0038-111-as01 to the Agg routers for uplink. Repatch replacement switch to end devices and configure Resolution Network upgrade completed successfully without issue. (15:00 AEST — Mar 7)<p>Scheduled for 2026-03-07 09:00:00 - 2026-03-07 15:00:00</p> <p>ITS will be replacing 01-0038-111-as01 (2 xC3750G-24PS), 01-0038-111-as02 (1 xC2960S-24PD) with 1 x 9300-48UXM access switches in TR 111. Connect new 01-0038-111-as01 to the Agg routers for uplink. Repatch replacement switch to end devices and configure</p> <hr> <p><strong>Resolution</strong> Network upgrade completed successfully without issue. <span class="faded">(15:00 AEST — Mar 7)</span> </p>[Scheduled] Access switch upgrade - Hawken TR C405https://status.its.uq.edu.au/issues/19830/Sun, 07 Dec 2025 07:00:00 +0000https://status.its.uq.edu.au/issues/19830/Scheduled for 2025-12-07 07:00:00 - 2025-12-07 22:00:00 Refresh and consolidation of network access switches in Hawken TR C405. Rack A - Replace 01-0050-c405-as01 with 1x 9300-48U Rack B - Consolidate 01-0050-c405-as02 &amp; 01-0050-c405-as05 into 1x 9300-48U Rack D - Consolidate 01-0050-c405-as04 &amp; 01-0050-c405-as06 into 2x 9300-48U Resolution Network access switch upgrades in Hawken C405 completely successfully. (22:00 AEST — Dec 7)<p>Scheduled for 2025-12-07 07:00:00 - 2025-12-07 22:00:00</p> <p>Refresh and consolidation of network access switches in Hawken TR C405.</p> <ol> <li> <p>Rack A - Replace 01-0050-c405-as01 with 1x 9300-48U</p> </li> <li> <p>Rack B - Consolidate 01-0050-c405-as02 &amp; 01-0050-c405-as05 into 1x 9300-48U</p> </li> <li> <p>Rack D - Consolidate 01-0050-c405-as04 &amp; 01-0050-c405-as06 into 2x 9300-48U</p> </li> </ol> <hr> <p><strong>Resolution</strong> Network access switch upgrades in Hawken C405 completely successfully. <span class="faded">(22:00 AEST — Dec 7)</span> </p>