UQ Statushttps://status.its.uq.edu.au/Incident historygithub.com/cstateenTue, 11 Aug 2026 22:00:00 +0000[Scheduled] Confluence Cloud Bundled Release Track Changes for August 2026https://status.its.uq.edu.au/issues/19996/Tue, 11 Aug 2026 22:00:00 +0000https://status.its.uq.edu.au/issues/19996/<p>Scheduled for 2026-08-11 22:00:00 - 2026-08-11 23:00:00</p> <p>Confluence Cloud Bundled Release Track Changes for August 2026:</p> <ul> <li>Whiteboards: View all contributors on sticky notes</li> <li>Proactive comment summary</li> <li>Redesigned in-app surveys</li> <li>Third-party app results appear in search</li> <li>Chat sidebar opens automatically after failed search in Confluence</li> <li>Drag and drop smart links into the page tree</li> <li>Whiteboards: Rotate objects</li> <li>Smart Links: Summarize and interact with linked content</li> <li>Resizable comments panel in Confluence</li> <li>Add time to date fields in Confluence databases</li> <li>Confluence whiteboards: Group elements to organize your work</li> <li>Confluence whiteboards: Custom font sizing</li> <li>Small text sizes available in the editor</li> <li>Layouts: Resize columns with interactive dividers</li> <li>System flags: Improved positioning and semantic icons</li> </ul>[Scheduled] Jira Cloud Bundled Release Track Changes for August 2026https://status.its.uq.edu.au/issues/19997/Tue, 11 Aug 2026 22:00:00 +0000https://status.its.uq.edu.au/issues/19997/<p>Scheduled for 2026-08-11 22:00:00 - 2026-08-11 23:00:00</p> <p>Jira Cloud Bundled Release Track Changes for August 2026:</p> <ul> <li>A quicker way to unlink work items</li> <li>See templates that fit how your team works</li> <li>Configure your filter panel with more fields and saved filters</li> <li>Request access to projects and boards</li> <li>Small text sizes available in the editor</li> <li>Start and complete sprints automatically in Jira</li> <li>Improvements to the timeline in business projects</li> <li>Bulk operations on timelines in business spaces</li> <li>Transition improvements in workflow editor</li> <li>Modify work types from your board</li> <li>List view: Group work items by date</li> <li>Recommended projects shown on your Jira home</li> <li>List: Expand and collapse all work items</li> <li>Group work items in the timeline view</li> <li>Centralized views for incidents and changes</li> <li>Swimlanes: A new way to group work on business boards</li> </ul>[Scheduled] Blackboard - OHS updateshttps://status.its.uq.edu.au/issues/19998/Mon, 10 Aug 2026 21:00:00 +0000https://status.its.uq.edu.au/issues/19998/<p>Scheduled for 2026-08-10 21:00:00 - 2026-08-10 22:00:00</p> <p>OHS training course content will be updated during this maintenance window. All OHS training course content will be unavailable for approximately 60 minutes, from 9pm on Monday 10 August, 2026. With the exception of the OHS course, access to Blackboard (learn.uq.edu.au) will remain unimpacted.</p>[Scheduled] JD Story Level 1 Access switches upgradehttps://status.its.uq.edu.au/issues/19995/Sun, 09 Aug 2026 07:00:00 +0000https://status.its.uq.edu.au/issues/19995/<p>Scheduled for 2026-08-09 07:00:00 - 2026-08-09 22:00:00</p> <p>ITS will be installing 2 x C9348 access switches into rack A 01-0061 TR102A.</p> <hr> <p><strong>Resolution</strong> Network upgrade completed successfully <span class="faded">(22:00 AEST — Aug 9)</span> </p>[Resolved] Website outagehttps://status.its.uq.edu.au/issues/19994/Fri, 07 Aug 2026 08:00:00 +0000https://status.its.uq.edu.au/issues/19994/2026-08-07 09:30:00<p>Some public UQ websites are unavailable and under investigation by ITS.</p> <hr> <p><strong>Resolution</strong> The hosting provider identified and resolved their issue. <span class="faded">(09:30 AEST — Aug 7)</span> </p> <p><strong>Update</strong> Website services have been fully restored. <span class="faded">(09:30 AEST — Aug 7)</span> </p>[Scheduled] Hightouch SaaS solution service enablementhttps://status.its.uq.edu.au/issues/19986/Thu, 06 Aug 2026 10:00:00 +0000https://status.its.uq.edu.au/issues/19986/<p>Scheduled for 2026-08-06 10:00:00 - 2026-08-06 12:00:00</p> <p>This change will enable the Hightouch SaaS solution to support audience segmentation and activation capabilities for Marketing and Communications. Hightouch will replace functionality currently enabled through Salesforce Marketing Cloud Advertising Studio and will utilise data from UQs Central Data Platform (Databricks environments).</p> <p>This implementation includes:</p> <ul> <li>Production activation of the Hightouch SaaS service.</li> <li>Configuration of approved source and destination connectivity.</li> <li>Establishment of user access and administrative controls.</li> </ul> UQ Alumni and Community website - Content updating unavailablehttps://status.its.uq.edu.au/issues/19992/Wed, 05 Aug 2026 22:45:00 +0000https://status.its.uq.edu.au/issues/19992/<p>The UQ Alumni and Community website is unavailable and under investigation by ITS.</p> <hr> <p><strong>Update</strong> ITS are continuing to investigate <span class="faded">(11:33 AEST — Aug 6)</span> </p> <p><strong>Update</strong> The UQ Alumni and Community website has been restored; however, web publishers cannot make content updates. <span class="faded">(13:30 AEST — Aug 6)</span> </p>[Resolved] UQ Digital Workspace - Region Wiide Issueshttps://status.its.uq.edu.au/issues/19991/Wed, 05 Aug 2026 11:20:00 +0000https://status.its.uq.edu.au/issues/19991/2026-08-05 13:00:00<p>There is a region wide issue with our Vendor - Omnissa. This is affecting the Digital Workspace in several ways. Users may have slow logins, missing desktops and applications.</p> <hr> <p><strong>Resolution</strong> OmOmnissa resolved the APAC region wide outage and service has been restored. <span class="faded">(13:00 AEST — Aug 5)</span> </p> Login disruption to some siteshttps://status.its.uq.edu.au/issues/19990/Tue, 04 Aug 2026 21:19:00 +0000https://status.its.uq.edu.au/issues/19990/<p>During this period, there was a problem with UQ Authenticates ability to contact Active Directory. Users would have experienced problems logging in to sites which required access to Active Directory groups.</p>[Scheduled] TRBOnet Server Version upgrade to 6.5https://status.its.uq.edu.au/issues/19987/Tue, 04 Aug 2026 08:00:00 +0000https://status.its.uq.edu.au/issues/19987/<p>Scheduled for 2026-08-04 08:00:00 - 2026-08-04 12:00:00</p> <p>The TRBOnet upgrade from v5.7 to v6.5 represents a major platform modernisation, delivering improved performance, enhanced stability, expanded interoperability &amp; new operational capabilities for MOTOTRBO radio networks.</p> <p>TRBOnet Enterprise 6.5 continues to provide a fully IP-based dispatch and control room solution while introducing support for newer Motorola radio system architectures, improved scalability and a more flexible system management framework.</p> <p>Key Improvements:</p> <ol> <li>Enhanced System Compatibility</li> <li>Improved Performance &amp; Scalability</li> <li>Dispatcher Console Enhancements</li> <li>Advanced Location Services</li> <li>Recording and Reporting Improvements</li> <li>Security &amp; Reliability Enhancements</li> </ol>[Scheduled] Power Outage in Gatton Impacting Wired and Wireless Network Serviceshttps://status.its.uq.edu.au/issues/19988/Mon, 03 Aug 2026 12:00:00 +0000https://status.its.uq.edu.au/issues/19988/<p>Scheduled for 2026-08-03 12:00:00 - 2026-08-06 12:21:00</p> <p>An unscheduled power outage is currently impacting both wired and wireless network services across multiple buildings at the Gatton campus.</p> <hr> <p><strong>Resolution</strong> power is resotored <span class="faded">(12:21 AEST — Aug 6)</span> </p>[Resolved] Transfer of enquiries from Oracle CRM to UQ engage temporarily impactedhttps://status.its.uq.edu.au/issues/19989/Mon, 03 Aug 2026 10:00:00 +0000https://status.its.uq.edu.au/issues/19989/2026-08-06 09:06:00<p>The creation of cases in UQ Engage from Oracle CRM is currently not completing the transfer.</p> <hr> <p><strong>Resolution</strong> On Oracles advice we updated script to use Queue ID instead of Queue name. This resulted in cases being successfully created in UQ Engage <span class="faded">(09:06 AEST — Aug 6)</span> </p>[Scheduled] Course Survey Evaluation System (Blue) - Version 8 to Version 9.7 Upgradehttps://status.its.uq.edu.au/issues/19985/Mon, 03 Aug 2026 09:00:00 +0000https://status.its.uq.edu.au/issues/19985/<p>Scheduled for 2026-08-03 09:00:00 - 2026-08-07 11:59:00</p> <p>UQs Course Survey Evaluation System (Explorance Blue) will be upgraded from Version 8 to Version 9.7.</p> <p>The current Blue 8 platform is approaching end-of-support and presents increasing operational, security and vendor support risks. This upgrade will move UQ to the vendor-supported Blue 9.7 platform and introduce the new Blue Next architecture while maintaining existing survey administration, reporting and Learn.UQ integrations.</p>[Scheduled] SI-net patchinghttps://status.its.uq.edu.au/issues/19993/Sun, 02 Aug 2026 06:00:00 +0000https://status.its.uq.edu.au/issues/19993/<p>Scheduled for 2026-08-02 06:00:00 - 2026-08-02 20:00:00</p> <p>SI-net will be unavailable during patching</p> <hr> <p><strong>Resolution</strong> <span class="faded">(20:00 AEST — Aug 2)</span> </p>[Scheduled] UniFi PeopleTools 8.62 Upgrade + July CPUhttps://status.its.uq.edu.au/issues/19983/Sat, 25 Jul 2026 06:00:00 +0000https://status.its.uq.edu.au/issues/19983/<p>Scheduled for 2026-07-25 06:00:00 - 2026-07-25 22:00:00</p> <p>Upgrade UniFi PeopleTools from 8.61 to 8.62 and apply July critical patch updates</p> <hr> <p><strong>Resolution</strong> <span class="faded">(22:00 AEST — Jul 25)</span> </p>[Resolved] Intermittent issues impacting M365 Teams meetings and connectionshttps://status.its.uq.edu.au/issues/19984/Fri, 24 Jul 2026 11:02:00 +0000https://status.its.uq.edu.au/issues/19984/2026-07-24 13:25:00<p>An issue which is preventing some users from joining M365 Teams meetings and/or is causing intermittent disconnections is currently impacting UQ.</p> <p>Microsoft are aware of this issue and are working towards a resolution. Further updates will be posted as they are released.</p> <hr> <p><strong>Update</strong> Some users may be unable to join or create Microsoft Teams meetings or calls</p> <p>Issue ID: TM1437780 Affected services: Microsoft Teams Status: Service degradation Issue type: Incident Start time: 24 Jul 2026, 10:54 GMT+10</p> <p>User impact Users may be unable to join or create Microsoft Teams meetings or calls.</p> <p>More info According to our initial impact analysis, the following scenarios are among those most impacted: -Transcriptions -1:1 Calling -Group calling -Meeting join -Meeting scheduling and creation -Public switched telephone network (PSTN) calls</p> <p>Scope of impact Any Microsoft Teams users may be impacted when attempting to create or join meetings or calls.</p> <p>Current status 24 Jul 2026, 11:26 GMT+10 We&rsquo;re investigating a potential networking issue which we suspect is associated with the impact, and we&rsquo;re working to identify the most expeditious mitigation approach. Next update by: Friday, 24 July 2026 at 12:00 GMT+10</p> <span class="faded">(11:46 AEST — Jul 24)</span> <p><strong>Resolution</strong> Microsoft have observed persistent recovery across all previously affected Teams service scenarios.</p> <p>Closer analysis identified a recent change which overloaded Microsoft&rsquo;s traffic management processes and caused impact. The service is now restored; however, users whose calls and meetings which were previously affected may need to end and restart those calls and meetings to see full recovery. <span class="faded">(13:25 AEST — Jul 24)</span> </p>[Scheduled] Gatton Library Network Upgrade - 1 x 9407/3 access switches into rack B 29-8102 TR120.https://status.its.uq.edu.au/issues/19980/Sun, 19 Jul 2026 07:00:00 +0000https://status.its.uq.edu.au/issues/19980/<p>Scheduled for 2026-07-19 07:00:00 - 2026-07-19 22:00:00</p> <p>ITS will be installing 1 x 9407/3 access switches into rack B 29-8102 TR120.</p> <hr> <p><strong>Resolution</strong> Network switch upgrade completed successfully <span class="faded">(22:00 AEST — Jul 19)</span> </p>[Scheduled] Router patching impacting wireless networkhttps://status.its.uq.edu.au/issues/19981/Sun, 19 Jul 2026 05:00:00 +0000https://status.its.uq.edu.au/issues/19981/<p>Scheduled for 2026-07-19 05:00:00 - 2026-07-19 06:30:00</p> <p>Software upgrade on the router for the wireless network scheduled for 05:00 and expected to take one hour.</p> <p>Wireless connectivity will be impacted during this time.</p> <hr> <p><strong>Resolution</strong> Update completed successfully <span class="faded">(06:30 AEST — Jul 19)</span> </p>[Scheduled] SCCM being upgraded to 2603https://status.its.uq.edu.au/issues/19978/Wed, 15 Jul 2026 20:07:00 +0000https://status.its.uq.edu.au/issues/19978/<p>Scheduled for 2026-07-15 20:07:00 - 2026-07-15 23:00:00</p> <p>SCCM is currently unavailable while upgrades are taking place.</p> <hr> <p><strong>Resolution</strong> Update completed successfully <span class="faded">(23:00 AEST — Jul 15)</span> </p>[Scheduled] Confluence Cloud Bundled Release Track Changes for July 2026https://status.its.uq.edu.au/issues/19971/Tue, 14 Jul 2026 22:00:00 +0000https://status.its.uq.edu.au/issues/19971/<p>Scheduled for 2026-07-14 22:00:00 - 2026-07-14 23:00:00</p> <p>Confluence Cloud Bundled Release Track Changes for July 2026:</p> <ul> <li>Whiteboards: Organize work on whiteboards with native tables</li> <li>Create with Rovo: Choose your content type</li> <li>Select teammates to get personalized content recommendations</li> <li>QR codes in email footers for mobile app downloads</li> <li>Smart links: Updated default display for specific content</li> <li>Block Menu: Effortless content transformation and organization</li> <li>Synced blocks: Keep content consistent across Confluence and Jira</li> <li>Bulk actions in the content tree</li> <li>Add a watermark to your images in Confluence</li> <li>Databases are discoverable in the toolbar</li> <li>Live share experience: Manage access with immediate, live updates</li> <li>Update Jira work items from Confluence databases</li> <li>Voting: Design refresh</li> </ul> <hr> <p><strong>Resolution</strong> Automatic resolution. <span class="faded">(23:00 AEST — Jul 14)</span> </p>[Scheduled] Jira Cloud Bundled Release Track Changes for July 2026https://status.its.uq.edu.au/issues/19972/Tue, 14 Jul 2026 22:00:00 +0000https://status.its.uq.edu.au/issues/19972/<p>Scheduled for 2026-07-14 22:00:00 - 2026-07-14 23:00:00</p> <p>Jira Cloud Bundled Release Track Changes for July 2026:</p> <ul> <li>Plans: Break down work with Atlassian Intelligence</li> <li>For You: Refresh and recommended actions</li> <li>A less confusing way to search with quick find in Jira</li> <li>Draft release notes with Rovo</li> <li>Easily expand all parent work items in Business Timeline</li> <li>Synced blocks: Keep content consistent across Confluence and Jira</li> <li>Invite teammates directly to a Board</li> <li>Space Insights: Customizable dashboards</li> <li>All work/List view: Inline editing for people custom fields</li> <li>Plans: Expanded support for custom fields</li> </ul> <hr> <p><strong>Resolution</strong> Automatic resolution. <span class="faded">(23:00 AEST — Jul 14)</span> </p>[Resolved] Power Outage in Gatton Impacting Wired and Wireless Networkshttps://status.its.uq.edu.au/issues/19977/Tue, 14 Jul 2026 12:55:00 +0000https://status.its.uq.edu.au/issues/19977/2026-07-14 14:30:00<p>An unscheduled power outage is currently impacting both wired and wireless network services across multiple buildings at the Gatton campus.</p> <p>Affected Buildings:</p> <p>8101 8107 8111 8115 8116 8117 8117a 8151 8166 8178 8179 8416 8419 8443 8538</p> <p>Impact: Users in the affected buildings experience a loss of:</p> <p>Wired network connectivity Wireless network connectivity Network-dependent services and applications</p> <p>P&amp;F is aware of the power outage and is currently investigating.</p> <hr> <p><strong>Resolution</strong> Power has been restored, and both wired and wireless network services are now operational. <span class="faded">(14:30 AEST — Jul 14)</span> </p>[Resolved] Power Outage in Gatton Impacting Wired and Wireless Networkshttps://status.its.uq.edu.au/issues/19975/Mon, 13 Jul 2026 13:15:00 +0000https://status.its.uq.edu.au/issues/19975/2026-07-13 15:38:00<p>An unscheduled power outage is currently impacting both wired and wireless network services across multiple buildings at the Gatton campus.</p> <p>Affected Buildings:</p> <p>8107 8111 8115 8116 8117 8117A 8151 8166 8178 8416 8419 8443 8538</p> <p>Impact: Users in the affected buildings experience a loss of:</p> <p>Wired network connectivity Wireless network connectivity Network-dependent services and applications</p> <p>P&amp;F is aware of the power outage and is currently investigating.</p> <hr> <p><strong>Resolution</strong> Power has been restored, and both wired and wireless network services are now operating normally. If you continue to experience any connectivity issues, please contact the IT Service Desk. <span class="faded">(15:38 AEST — Jul 13)</span> </p>[Scheduled] SiPass Service - Implementation of bug fixes related to SiPass Cardholder functionshttps://status.its.uq.edu.au/issues/19973/Mon, 13 Jul 2026 08:30:00 +0000https://status.its.uq.edu.au/issues/19973/<p>Scheduled for 2026-07-13 08:30:00 - 2026-07-13 10:00:00</p> <p>This maintenance work will address some recently discovered bug fixes relating to various SiPass cardholder functions, including:</p> <ul> <li>Duplication of access levels and groups being applied on Cardholder record creation/updates</li> <li>Issues updating and/or generating some Cardholder records</li> </ul> <hr> <p><strong>Resolution</strong> Automatic resolution. <span class="faded">(10:00 AEST — Jul 13)</span> </p>[Scheduled] Emergency Maintenance - MySQL RDS Upgrade for UQ Extend Learning Management Systemhttps://status.its.uq.edu.au/issues/19974/Fri, 10 Jul 2026 22:30:00 +0000https://status.its.uq.edu.au/issues/19974/<p>Scheduled for 2026-07-10 22:30:00 - 2026-07-11 00:00:00</p> <p>UQ Extends MySQL Amazon RDS instance needs to be updated from current version 8.0 to version 8.4, due to version 8.0 reaching end of support in AWS from July 31, 2026.</p> <p>This critical maintenance will necessitate approximately 90 minutes of downtime from 10.30pm on Friday, July 10, 2026. The system maintenance is being conducted at this time so that it can be safely completed before the start of Semester 2.</p> <hr> <p><strong>Resolution</strong> Post-upgrade validation and testing have been completed successfully. All functionality has been verified, and the environment is operating normally. <span class="faded">(00:00 AEST — Jul 11)</span> </p>[Resolved] Telstra Service Disruption Affecting Mobile Coveragehttps://status.its.uq.edu.au/issues/19969/Wed, 08 Jul 2026 07:19:00 +0000https://status.its.uq.edu.au/issues/19969/2026-07-09 12:30:00<p>Telstra is currently experiencing an outage that is impacting some customers, with reports of limited or unavailable network coverage this morning. Triple Zero is not affected.</p> <hr> <p><strong>Update</strong> Telstra have advised that most service connectivity has been restored. We will provide a further update upon confirmation of full restoration. <span class="faded">(09:47 AEST — Jul 8)</span> </p> <p><strong>Update</strong> Telstra has advised that yesterday&rsquo;s outage has now been resolved. However, a secondary issue has been identified that is still affecting some calls for a subset of customers. Telstra is continuing to investigate this issue and work towards full service restoration.</p> <p>We will continue to monitor the situation and provide further updates as they become available. <span class="faded">(09:50 AEST — Jul 9)</span> </p> <p><strong>Update</strong> Telstra has advised that the mobile network outage reported on 8 July has now been fully resolved.</p> <p>The primary outage was restored at approximately 4:00pm on 8 July. Following restoration, Telstra identified a secondary issue affecting some call routing, including impacts to a small number of voice calls. Telstra has confirmed this issue was fully resolved at approximately 12:30pm on 9 July.</p> <p>According to Telstra, the outage was caused by a software defect. While the initial remediation restored network services, the defect also affected certain call routing functionality and required an additional fix to fully restore service.</p> <p>Telstra has confirmed that all impacted services are now operating normally.</p> <p>We thank you for your patience and understanding while Telstra worked to restore services. <span class="faded">(12:06 AEST — Jul 13)</span> </p> <p><strong>Resolution</strong> According to Telstra, the outage was caused by a software defect. While the initial remediation restored network services, the defect also affected some call routing functionality and required a further fix to achieve full service restoration.</p> <p>Telstra has confirmed that all impacted services are now operating normally. <span class="faded">(12:30 AEST — Jul 9)</span> </p>[Resolved] Gatton Power Outage Impacting Wired and Wireless Networkshttps://status.its.uq.edu.au/issues/19968/Mon, 06 Jul 2026 14:04:00 +0000https://status.its.uq.edu.au/issues/19968/2026-07-06 16:53:00<p>A power outage in Gatton has caused an outage affecting both wired and wireless network services in multiple buildings.</p> <p>The following buildings are impacted 8178 8144 8125 8117 8124 8143 8123 8107 8166 8122 8118 8113 8369 8117a 8112 8538 8151 8121b 8111 8360 8162 8150 8179 8116 8443 8307 8115 8419 8300c 8145 8416</p> <hr> <p><strong>Update</strong> Power has been restored. Wired and wireless network services have recovered across all buildings, except for Building 8116 (Agricultural Mechanisation B). The Gatton DSS team will conduct further investigation tomorrow. <span class="faded">(16:21 AEST — Jul 6)</span> </p> <p><strong>Resolution</strong> Power has been restored, and wired and wireless network services are now operational <span class="faded">(16:53 AEST — Jul 6)</span> </p>[Resolved] VC Email suspended at 1500 out of 28,233 senthttps://status.its.uq.edu.au/issues/19966/Fri, 26 Jun 2026 13:00:00 +0000https://status.its.uq.edu.au/issues/19966/2026-06-26 15:37:00<p>Suspended by error. Mailing stopped prematurely. Contact Oracle Customer Support.</p> <p>Raised Sr and being treated with priority</p> <hr> <p><strong>Resolution</strong> Email delivery was rate limited by ESAs as an unexpected IP address was used in the sending. The usual IP range for bulk mailings allows fast delivery. As this was not in the known range it was set to &rsquo;normal&rsquo; which is 3,000 per hour. i.e. &gt;9 hours for all staff email (approx. 28,000) We have arranged for 2 dedicated IP addresses to be warmed up and we will switch to using those in late August. We have had no other instances of broadcast email delivery being throttled. <span class="faded">(15:37 AEST — Jun 26)</span> </p>[Resolved] Protocols unresponsivehttps://status.its.uq.edu.au/issues/19964/Thu, 25 Jun 2026 22:32:00 +0000https://status.its.uq.edu.au/issues/19964/2026-06-26 13:19:00<p>The back end storage is currently unresponsive we are working with the vendor to bring this back on line</p> <hr> <p><strong>Resolution</strong> restart of storage cluster fixed protocol nodes <span class="faded">(13:19 AEST — Jun 26)</span> </p>[Resolved] SMB shares slow or unusablehttps://status.its.uq.edu.au/issues/19965/Thu, 25 Jun 2026 22:32:00 +0000https://status.its.uq.edu.au/issues/19965/2026-06-25 23:32:00<p>The backend storage is unresponsive, working with vendor to bring back online</p> <hr> <p><strong>Resolution</strong> restarted storage cluster to remove deadlock <span class="faded">(23:32 AEST — Jun 25)</span> </p>[Scheduled] SI-net patchinghttps://status.its.uq.edu.au/issues/19961/Sun, 21 Jun 2026 07:00:00 +0000https://status.its.uq.edu.au/issues/19961/<p>Scheduled for 2026-06-21 07:00:00 - 2026-06-21 17:30:00</p> <p>SI-net will be unavailable during patching</p> <hr> <p><strong>Resolution</strong> <span class="faded">(17:30 AEST — Jun 21)</span> </p>[Scheduled] 2026 June Oracle CVE patching - UniFi PeopleToolshttps://status.its.uq.edu.au/issues/19963/Sat, 20 Jun 2026 07:00:00 +0000https://status.its.uq.edu.au/issues/19963/<p>Scheduled for 2026-06-20 07:00:00 - 2026-06-20 15:30:00</p> <p>To ensure our systems remain secure and compliant, UQ must apply patches on UniFi.</p> <hr> <p><strong>Resolution</strong> <span class="faded">(15:30 AEST — Jun 20)</span> </p>[Resolved] Caller ID not displayed correctlyhttps://status.its.uq.edu.au/issues/19960/Thu, 18 Jun 2026 08:00:00 +0000https://status.its.uq.edu.au/issues/19960/2026-07-06 08:59:00<p>Some Outbound calls from UQ phone system displaying generic Caller ID.</p> <p>ITS are investigating with carrier and vendor</p> <hr> <p><strong>Update</strong> Carrier is still investigating solution as all outbound calls are displaying 0735489300. <span class="faded">(16:40 AEST — Jun 19)</span> </p> <p><strong>Resolution</strong> Carrier configuration applied <span class="faded">(17:00 AEST — Jun 22)</span> </p> <p><strong>Resolution</strong> Unscheduled Carrier change <span class="faded">(08:59 AEST — Jul 6)</span> </p>[Resolved] Turnitin - grades synchronisation issuehttps://status.its.uq.edu.au/issues/19958/Tue, 16 Jun 2026 13:00:00 +0000https://status.its.uq.edu.au/issues/19958/2026-06-19 01:00:00<p>A grades synchronisation reliability issue is currently impacting some Semester 1 courses that use Turnitin assessments.</p> <p>A priority 1 incident has been raised with the service vendor. ITS will publish further updates as they become available.</p> <hr> <p><strong>Resolution</strong> The vendor performed the grades correction overnight Friday night.</p> <p>It has also been confirmed that none of the 221 courses impacted had yet finalised their grades to SI-net.</p> <p>An email has now been sent to each affected Course Coordinator advising them of the mark updates and to take action if required (e.g. if already downloaded to spreadsheet). School Managers have been emailed with a copy of the communication sent to Course Coordinators and a list of affected courses within their school. We anticipate this to be our last update now that staff have been notified of the fix. <span class="faded">(01:00 AEST — Jun 19)</span> </p>[Resolved] UQ Extend Emergency Maintenancehttps://status.its.uq.edu.au/issues/19957/Sat, 13 Jun 2026 00:00:00 +0000https://status.its.uq.edu.au/issues/19957/2026-06-13 01:30:00<p>Please be advised that UQ Extend will undergo emergency maintenance from 12am Saturday 13 June, 2026 (midnight tonight), and will be unavailable to staff and students for approximately 1.5 hours. We appreciate your patience while we address this urgent matter.</p> <hr> <p><strong>Resolution</strong> <span class="faded">(01:30 AEST — Jun 13)</span> </p> <p><strong>Update</strong> Decision taken to perform emergency maintenance overnight (midnight window) to minimise impact.</p> <p>Vendor deployed updates to production, including:</p> <ul> <li>Upgrading EKS node groups</li> <li>Addressing vulnerable ingress configurations</li> <li>Post-deployment validation confirmed:</li> <li>Core platform functionality operational</li> <li>All key user journeys tested successfully</li> <li>Technical validation identified:</li> <li>The vulnerable ingress rule was limited to the internal Kubernetes Dashboard and not exposed publicly</li> <li>Configuration updates successfully removed the threat <span class="faded">(21:41 AEST — Jun 15)</span> </li> </ul>[Resolved] Account maintenance disabledhttps://status.its.uq.edu.au/issues/19956/Thu, 11 Jun 2026 17:30:00 +0000https://status.its.uq.edu.au/issues/19956/2026-06-22 11:32:00<p>Due to a unexpected upstream data change, UniTask account maintenance has been disabled to prevent significant service disruption.</p> <p>Most UniTask users will not be impacted.</p> <p>New UQ staff and students or users that have changed UQ org roles will not have those changes reflected in UniTask until the account maintenance process has been restore.</p> <p>We are working to understand and mitigate the impacts of the incoming data change so that we can restore the account maintenance process.</p> <hr> <p><strong>Update</strong> The Data Services team has helped us identify a solution to fix this particular data issue as well as future issues of this type.</p> <p>We expect that this solution will be implemented and tested this week, with a possible production release next Monday.</p> <p>Account maintenance will remain disabled, though the UniTask team can make ad-hoc adjustments as required. If you have any UniTask account issues or requests, please reach out on <a href="mailto:bpd.support@uq.edu.au">bpd.support@uq.edu.au</a> <span class="faded">(13:15 AEST — Jun 15)</span> </p> <p><strong>Resolution</strong> The Integration Services team has applied a fix to handle unexpected org unit data changes that break UniTask.</p> <p>We are working with the university to try receive advanced notice of future changes.</p> <p>Account maintenance has been re-enabled in UniTask. <span class="faded">(11:32 AEST — Jun 22)</span> </p>[Scheduled] UniFi urgent maintenancehttps://status.its.uq.edu.au/issues/19954/Thu, 11 Jun 2026 13:36:00 +0000https://status.its.uq.edu.au/issues/19954/<p>Scheduled for 2026-06-11 13:36:00 - 2026-06-11 15:20:00</p> <p>The UniFi Financial system will be undergoing urgent maintenance. During this time users and other integrated systems may experience connection issues. Apologies for the inconvenience.</p> <hr> <p><strong>Resolution</strong> UniFi maintenance has been completed. <span class="faded">(15:20 AEST — Jun 11)</span> </p>[Resolved] SI-net urgent maintenancehttps://status.its.uq.edu.au/issues/19955/Thu, 11 Jun 2026 12:00:00 +0000https://status.its.uq.edu.au/issues/19955/2026-06-11 14:56:00<p>The mySI-net system will be undergoing urgent maintenance. During this time users and other integrated systems may experience connection issues. ITS apologies for the inconvenience.</p> <hr> <p><strong>Resolution</strong> UniFi maintenance has now been completed. <span class="faded">(14:56 AEST — Jun 11)</span> </p> <p><strong>Resolution</strong> SI-net urgent maintenance is now completed. <span class="faded">(14:56 AEST — Jun 11)</span> </p>[Resolved] Problems issuing Temporary Access Codeshttps://status.its.uq.edu.au/issues/19953/Fri, 05 Jun 2026 20:00:00 +0000https://status.its.uq.edu.au/issues/19953/2026-06-08 12:40:00<p>Delays are being experienced processing Temporary Access Code requests. Engineers are aware of the problem and are working to resolve the issue.</p> <hr> <p><strong>Resolution</strong> Temporary Access Codes are again being issued in a timely manner. <span class="faded">(12:40 AEST — Jun 8)</span> </p>[Resolved] TurnItIn not workinghttps://status.its.uq.edu.au/issues/19952/Thu, 04 Jun 2026 10:00:00 +0000https://status.its.uq.edu.au/issues/19952/2026-06-04 11:12:00<p>ITS and the vendor are investigating issues affecting TurnItIn. Error messages are appearing</p> <hr> <p><strong>Resolution</strong> The vendor has resolved the outage for TurnItIn <span class="faded">(11:12 AEST — Jun 4)</span> </p>[Scheduled] Emergency Maintenance to UQ Student Hubhttps://status.its.uq.edu.au/issues/19949/Tue, 02 Jun 2026 20:00:00 +0000https://status.its.uq.edu.au/issues/19949/<p>Scheduled for 2026-06-02 20:00:00 - 2026-06-02 20:20:00</p> <p>To address a number of ongoing application performance issues with the UQ Student Hub (Careerhub) service, the application vendor (Symplicity) will be performing emergency platform maintenance at 8pm this evening.</p> <p>UQ Student Hub will be unavailable in this emergency maintenance window for approximately 20 minutes.</p> <hr> <p><strong>Resolution</strong> Infrastructure/compute capacity has been adjusted by the vendor. An incident report is forthcoming. <span class="faded">(20:20 AEST — Jun 2)</span> </p>[Scheduled] Blackboard - OHS updateshttps://status.its.uq.edu.au/issues/19948/Sun, 31 May 2026 21:00:00 +0000https://status.its.uq.edu.au/issues/19948/<p>Scheduled for 2026-05-31 21:00:00 - 2026-05-31 22:30:00</p> <p>OHS training course content will be updated during this maintenance window.</p> <p>All OHS training course content will be unavailable for approximately 90 minutes, from 9pm on Sunday 31 May, 2026.</p> <p>With the exception of the OHS course, access to Blackboard (learn.uq.edu.au) will remain unimpacted.</p> <hr> <p><strong>Resolution</strong> OHS course maintenance completed successfully. <span class="faded">(22:30 AEST — May 31)</span> </p>[Scheduled] Aurion and MyAurion Upgradehttps://status.its.uq.edu.au/issues/19947/Sat, 30 May 2026 07:00:00 +0000https://status.its.uq.edu.au/issues/19947/<p>Scheduled for 2026-05-30 07:00:00 - 2026-05-30 11:00:00</p> <p>Aurion and MyAurion will be unavailable due to system upgrade. We apologize for any inconvenience.</p> <hr> <p><strong>Resolution</strong> <span class="faded">(11:00 AEST — May 30)</span> </p>[Scheduled] ARCHIBUS upgrade to V.2025.01https://status.its.uq.edu.au/issues/19943/Fri, 29 May 2026 16:30:00 +0000https://status.its.uq.edu.au/issues/19943/<p>Scheduled for 2026-05-29 16:30:00 - 2026-05-29 22:00:00</p> <p>The Archibus service will be upgraded from V.2022.04 to V.2025.01.</p> <p>This upgrade includes a range of system improvements, including:</p> <ul> <li>Enhanced security and system stability</li> <li>Updated Archibus interface and functionality</li> <li>Improvements to system performance and compatibility</li> <li>Future capability to support newer Archibus mobile functionality, including Archibus OnSite</li> <li>Ongoing vendor supported updates and fixes</li> </ul> <p>** Action required **</p> <p>As part of the upgrade process, users may need to clear their browser cache after the upgrade has been completed.</p> <p>To clear your browser cache, please refer to the following article: <a href="https://support.staff.uq.edu.au/app/answers/detail/a_id/2538">https://support.staff.uq.edu.au/app/answers/detail/a_id/2538</a></p> <hr> <p><strong>Resolution</strong> Archibus version upgrade completed successfully. <span class="faded">(22:00 AEST — May 29)</span> </p>[Scheduled] Jac Data fixhttps://status.its.uq.edu.au/issues/19940/Wed, 27 May 2026 17:00:00 +0000https://status.its.uq.edu.au/issues/19940/<p>Scheduled for 2026-05-27 17:00:00 - 2026-05-27 23:00:00</p> <p>Vendor will be applying a data fix to the Production system. During this time Jac will be unavailable.</p> <hr> <p><strong>Resolution</strong> <span class="faded">(23:00 AEST — May 27)</span> </p>[Scheduled] Jac Prod database patchinghttps://status.its.uq.edu.au/issues/19917/Tue, 26 May 2026 17:00:00 +0000https://status.its.uq.edu.au/issues/19917/<p>Scheduled for 2026-05-26 17:00:00 - 2026-05-26 23:59:00</p> <p>Vendor managed database patching including data fix</p> <hr> <p><strong>Resolution</strong> <span class="faded">(23:59 AEST — May 26)</span> </p>[Resolved] UQ Digital Asset Manager (DAM) - service currently unavailablehttps://status.its.uq.edu.au/issues/19942/Mon, 25 May 2026 11:45:00 +0000https://status.its.uq.edu.au/issues/19942/2026-05-25 13:15:00<p>A user authentication issue is currently impacting access to the UQ Digital Asset Manager (DAM).</p> <p>DAM users may see a Sorry, but were having trouble signing you in error message when attempting to login.</p> <p>A priority ticket has been raised with the service vendor.</p> <hr> <p><strong>Resolution</strong> The vendor has corrected the issue with the user authentication module. Service access has now been restored to normal. <span class="faded">(13:15 AEST — May 25)</span> </p>[Scheduled] Omnissa Horizon Cloud Service: EDGE Upgradehttps://status.its.uq.edu.au/issues/19938/Sun, 24 May 2026 12:45:00 +0000https://status.its.uq.edu.au/issues/19938/<p>Scheduled for 2026-05-24 12:45:00 - 2026-05-24 14:45:00</p> <p>Omnissa Horizon will be performing maintenance on the Horizon platform on Sunday 24/05/2026 from 12:45PM to 2:45PM AEST.</p> <p>To ensure serviceability the current version installed on the EDGE Gateway will be upgraded for the Horizon Edge UQ-Azure-Horizon-Edge.</p> <p>During the EDGE upgrade there will be impact to single sign on for end-users connecting to desktops. Desktops will still be available, and end-users can connect but need to manually log in to their VM.</p> <hr> <p><strong>Resolution</strong> <span class="faded">(14:45 AEST — May 24)</span> </p>[Scheduled] Access Switches Upgrade - Gatton 29-8101 TR202a NW Briton Admin Buildinghttps://status.its.uq.edu.au/issues/19939/Sun, 24 May 2026 09:00:00 +0000https://status.its.uq.edu.au/issues/19939/<p>Scheduled for 2026-05-24 09:00:00 - 2026-05-24 19:00:00</p> <p>ITS will be installing 1 x 9407/2 access switches into rack A 29-8101 TR202a and 2 x 32A PDUs at front of rack connected to 2x 32A power drop down pendants.</p> <hr> <p><strong>Resolution</strong> Access switch upgrade has been completed successfully <span class="faded">(19:00 AEST — May 24)</span> </p>[Resolved] Staff and Student SMS sites are offlinehttps://status.its.uq.edu.au/issues/19936/Tue, 19 May 2026 13:30:00 +0000https://status.its.uq.edu.au/issues/19936/2026-05-19 16:47:00<p>Due to some technical issues, the Staff and Student SMS sites are offline.</p> <p>ITS staff are investigating.</p> <hr> <p><strong>Resolution</strong> ITS has resolved issues and the Staff &amp; Student SMS sites are working now. <span class="faded">(16:47 AEST — May 19)</span> </p>[Scheduled] SiPass Production Upgrade to version 3.0https://status.its.uq.edu.au/issues/19935/Thu, 14 May 2026 11:00:00 +0000https://status.its.uq.edu.au/issues/19935/<p>Scheduled for 2026-05-14 11:00:00 - 2026-05-19 17:00:00</p> <p>This upgrade is required for continued vendor application support, compatibility with newer hardware firmware, cyber security, stability and performance improvements, and improved application functionality.</p> <hr> <p><strong>Resolution</strong> The system upgrade to SiPass major version 3.0 was successful. <span class="faded">(17:00 AEST — May 19)</span> </p> <p><strong>Resolution</strong> The system upgrade to SiPass version 3.0 was successful. SiPass is now available for all Card Custodians and SiPass users. <span class="faded">(17:00 AEST — May 19)</span> </p>[Scheduled] Confluence Cloud Bundled Release Track Changes for May 2026https://status.its.uq.edu.au/issues/19927/Tue, 12 May 2026 22:00:00 +0000https://status.its.uq.edu.au/issues/19927/<p>Scheduled for 2026-05-12 22:00:00 - 2026-05-12 23:00:00</p> <p>Confluence Cloud Bundled Release Track Changes for May 2026:</p> <ul> <li>Rich text: Format text in database fields</li> <li>Customise PDF exports with a new formatting experience</li> <li>Enhanced filtering for Jira fields in Confluence Databases</li> <li>Updated keyboard shortcuts when moving rows and columns</li> <li>Open Smart Links in new tab</li> <li>Drag and drop Smart Links into the content tree</li> </ul> <hr> <p><strong>Resolution</strong> Bundled releases for May 2026 completed <span class="faded">(23:00 AEST — May 12)</span> </p>[Scheduled] Jira Cloud Bundled Release Track Changes for May 2026https://status.its.uq.edu.au/issues/19928/Tue, 12 May 2026 22:00:00 +0000https://status.its.uq.edu.au/issues/19928/<p>Scheduled for 2026-05-12 22:00:00 - 2026-05-12 23:00:00</p> <p>Jira Cloud Bundled Release Track Changes for May 2026:</p> <ul> <li>Workflows: New editor now the default</li> <li>Jira Plans - New Filter menu on the timeline view</li> <li>Unlink work items faster in the Related work section</li> <li>Personalise your work items with cover images</li> <li>New workflow editor: allows multiple global transitions to the same status</li> <li>List view: Group by hierarchy</li> <li>Find and add responders in the incident search bar</li> <li>Workflow editor: Load and publish changes from old editor drafts</li> <li>Receive search results even with minor validation issues in your JQL</li> <li>Jump into your spaces faster from the For you page</li> </ul> <hr> <p><strong>Resolution</strong> Bundled releases for May 2026 completed <span class="faded">(23:00 AEST — May 12)</span> </p>[Scheduled] Cutover exchange.uq.edu.au to newer Servershttps://status.its.uq.edu.au/issues/19925/Tue, 12 May 2026 16:00:00 +0000https://status.its.uq.edu.au/issues/19925/<p>Scheduled for 2026-05-12 16:00:00 - 2026-05-12 17:00:00</p> <p>Updating the load balancer record for exchange.uq.edu.au to point to the new exchange servers.</p> <hr> <p><strong>Resolution</strong> Cutover successful. <span class="faded">(17:00 AEST — May 12)</span> </p>[Resolved] Performance/Availability issues with UQ StudentHub (Careerhub)https://status.its.uq.edu.au/issues/19931/Tue, 12 May 2026 13:30:00 +0000https://status.its.uq.edu.au/issues/19931/2026-05-13 15:15:00<p>System performance issues are currently being experienced by users of the UQ StudentHub (Careerhub) service.</p> <p>Current issues include internittent service logon failures, and overall slow application performance for users already logged into the platform.</p> <p>A critical support ticket has been logged with the service provider.</p> <hr> <p><strong>Resolution</strong> A background task responsible for building the index which controls search results and many other functions of UQ StudentHub had failed, but the system continued attempting to rebuild it repeatedly. Combined with other activities running in UQ StudentHub at the time, this caused CPU usage to reach maximum capacity, which resulted in unscheduled performance issues.</p> <p>Vendor support worked with the application development team to clear the failed task and successfully rebuild the necessary database indexes. <span class="faded">(15:15 AEST — May 13)</span> </p>[Resolved] New Okta users are unable to request Temporary Access Codes (TAC)https://status.its.uq.edu.au/issues/19933/Tue, 12 May 2026 10:00:00 +0000https://status.its.uq.edu.au/issues/19933/2026-05-15 12:00:00<p>Due to default product constraints imposed by the vendor, recently created users in Okta are unable to access the TAC request process. An escalated case has been filed with Okta, and their engineers are currently investigating the issue.</p> <hr> <p><strong>Resolution</strong> <span class="faded">(12:00 AEST — May 15)</span> </p>[Resolved] SI-net application restarthttps://status.its.uq.edu.au/issues/19930/Sun, 10 May 2026 21:00:00 +0000https://status.its.uq.edu.au/issues/19930/2026-05-10 21:45:00<p>SI-net will be unavailable for post patch maintenance.</p> <hr> <p><strong>Resolution</strong> <span class="faded">(21:45 AEST — May 10)</span> </p>[Scheduled] SI-net patchinghttps://status.its.uq.edu.au/issues/19926/Sat, 09 May 2026 06:00:00 +0000https://status.its.uq.edu.au/issues/19926/<p>Scheduled for 2026-05-09 06:00:00 - 2026-05-09 20:00:00</p> <p>SI-net will be unavailable during patching</p> <hr> <p><strong>Resolution</strong> <span class="faded">(20:00 AEST — May 9)</span> </p>[Resolved] Gatton Campus Wired and wireless network services are currently unavailable in some buildings due to a power outagehttps://status.its.uq.edu.au/issues/19929/Fri, 08 May 2026 13:00:00 +0000https://status.its.uq.edu.au/issues/19929/2026-05-08 17:00:00<p>A power outage has impacted network infrastructure in some buildings at Gatton Campus, resulting in the loss of both wired and wireless connectivity in the affected areas.</p> <hr> <p><strong>Resolution</strong> Power was restored <span class="faded">(17:00 AEST — May 8)</span> </p>[Scheduled] Aurion and MyAurion unavailablehttps://status.its.uq.edu.au/issues/19923/Tue, 05 May 2026 17:00:00 +0000https://status.its.uq.edu.au/issues/19923/<p>Scheduled for 2026-05-05 17:00:00 - 2026-05-05 17:15:00</p> <p>Aurion and MyAurion will be unavailable during the restart of services due to emergency.</p> <hr> <p><strong>Resolution</strong> Aurion restarts have been completed. Aurion and MyAurion are available again. <span class="faded">(17:15 AEST — May 5)</span> </p>[Resolved] Microsoft loginshttps://status.its.uq.edu.au/issues/19924/Tue, 05 May 2026 11:00:00 +0000https://status.its.uq.edu.au/issues/19924/2026-05-06 16:09:00<p>Personal logins from Microsoft failing, still ascertaining scope and cause</p> <hr> <p><strong>Resolution</strong> created new secret and replaced in simple saml auth config <span class="faded">(16:09 AEST — May 6)</span> </p>[Scheduled] REDCap migrationhttps://status.its.uq.edu.au/issues/19922/Sat, 02 May 2026 08:00:00 +0000https://status.its.uq.edu.au/issues/19922/<p>Scheduled for 2026-05-02 08:00:00 - 2026-05-02 20:00:00</p> <p>Migrating to new location</p> <hr> <p><strong>Resolution</strong> migration completed <span class="faded">(20:00 AEST — May 2)</span> </p>[Scheduled] SCCM Unavailable for imaginghttps://status.its.uq.edu.au/issues/19912/Thu, 30 Apr 2026 16:00:00 +0000https://status.its.uq.edu.au/issues/19912/<p>Scheduled for 2026-04-30 16:00:00 - 2026-04-30 17:00:00</p> <p>The SCCM database server is applying updates. As such, the service will be unavailable for imaging PCs during this time.</p> <hr> <p><strong>Update</strong> Rescheduled to Thursday as the Database isn&rsquo;t being upgraded until then. <span class="faded">(07:43 AEST — Apr 28)</span> </p> <p><strong>Resolution</strong> DB servers updated. <span class="faded">(17:00 AEST — Apr 30)</span> </p>[Resolved] DWRDS (SiPass, RE,Aurion)https://status.its.uq.edu.au/issues/19919/Thu, 30 Apr 2026 11:06:00 +0000https://status.its.uq.edu.au/issues/19919/2026-04-30 12:06:00<p>Some Users are unable to access RDS and launch sessions.</p> <hr> <p><strong>Resolution</strong> Windows update has applied a hardened security layer to the the Remote Desktop Client.</p> <p>Security settings on the RDS connection broker have been adjusted to support the latest updates. <span class="faded">(12:06 AEST — Apr 30)</span> </p>[Resolved] Bunya HPC unavailable.https://status.its.uq.edu.au/issues/19918/Thu, 30 Apr 2026 10:00:00 +0000https://status.its.uq.edu.au/issues/19918/2026-04-30 20:51:00<p>Bunya HPC is currently unavailable. The team is investigating and will update when more information is available.</p> <hr> <p><strong>Update</strong> The issues on Bunya HPC have now been resolved, and access has been restored.</p> <p>Jobs that were running on Bunya have been terminated. Researchers are encouraged to check their jobs for any issues.</p> <p>The team is working on an update about the issue, which will be sent via email tomorrow.</p> <p>Please contact <a href="mailto:rcc-support@uq.edu.au">rcc-support@uq.edu.au</a> for assistance. <span class="faded">(20:52 AEST — Apr 30)</span> </p> <p><strong>Resolution</strong> The issues on Bunya HPC have now been resolved, and access has been restored.</p> <p>Jobs that were running on Bunya have been terminated. Researchers are encouraged to check their jobs for any issues.</p> <p>The team is working on an update about the issue, which will be sent via email tomorrow.</p> <p>Please contact <a href="mailto:rcc-support@uq.edu.au">rcc-support@uq.edu.au</a> for assistance. <span class="faded">(08:51 AEST — Apr 30)</span> </p>[Resolved] Load on storage hostshttps://status.its.uq.edu.au/issues/19916/Thu, 23 Apr 2026 21:46:00 +0000https://status.its.uq.edu.au/issues/19916/2026-04-26 07:59:00<p>we have seen an increase in load on the storage serverrs and have logged a call with the vendors to rectify</p> <hr> <p><strong>Resolution</strong> reboot of stuck gateway cleared load on storage servers <span class="faded">(07:59 AEST — Apr 26)</span> </p>[Scheduled] UQ StudentHub (CareerHub) - Upgrade to Version 5.17https://status.its.uq.edu.au/issues/19913/Thu, 23 Apr 2026 20:00:00 +0000https://status.its.uq.edu.au/issues/19913/<p>Scheduled for 2026-04-23 20:00:00 - 2026-04-23 20:45:00</p> <p>The UQ StudentHub (Careerhub) application will be upgraded by the vendor (Symplicity) to version 5.17.</p> <p>This new version will introduce a number of bug fixes and feature updates, including:</p> <ul> <li>Improved check-in capabilities</li> <li>Appointment Search redesign for Students</li> <li>SMS opt-in updates</li> <li>Enhanced Job Search for Students</li> <li>Visual enhancements to Questions</li> <li>New Fields for Jobs and Forms Redesign</li> <li>Default Job Information and Advice, and Scam Alerts</li> <li>Improved Verication Request Page</li> <li>Verification of Experiences by External Providers</li> <li>Attachments for Event Requests</li> </ul> <hr> <p><strong>Resolution</strong> Upgrade to v5.17 successful. <span class="faded">(20:45 AEST — Apr 23)</span> </p>[Resolved] UQRDM NextCloud is unavailablehttps://status.its.uq.edu.au/issues/19915/Thu, 23 Apr 2026 13:08:00 +0000https://status.its.uq.edu.au/issues/19915/2026-04-23 21:46:00<p>ITS is investigating issues for the RDM Cloud service. This service is currently not accessible.</p> <hr> <p><strong>Resolution</strong> systems stabilised and are back online <span class="faded">(21:46 AEST — Apr 23)</span> </p>[Scheduled] Plus Suite Security Upgradehttps://status.its.uq.edu.au/issues/19904/Sat, 18 Apr 2026 17:00:00 +0000https://status.its.uq.edu.au/issues/19904/<p>Scheduled for 2026-04-18 17:00:00 - 2026-04-18 17:30:00</p> <p>Vendor managed security upgrade to Plus Suite</p> <hr> <p><strong>Resolution</strong> <span class="faded">(17:30 AEST — Apr 18)</span> </p>[Scheduled] Plus Suite Security Upgradehttps://status.its.uq.edu.au/issues/19905/Sat, 18 Apr 2026 17:00:00 +0000https://status.its.uq.edu.au/issues/19905/<p>Scheduled for 2026-04-18 17:00:00 - 2026-04-18 17:30:00</p> <p>Vendor Managed security upgrade for Plus Suite</p> <hr> <p><strong>Resolution</strong> <span class="faded">(17:30 AEST — Apr 18)</span> </p>[Scheduled] Plus Suite Security Upgradehttps://status.its.uq.edu.au/issues/19903/Sat, 18 Apr 2026 17:00:00 +0000https://status.its.uq.edu.au/issues/19903/<p>Scheduled for 2026-04-18 17:00:00 - 2026-04-18 17:30:00</p> <p>Vendor managed security upgrade for Plus Suite</p> <hr> <p><strong>Resolution</strong> <span class="faded">(17:30 AEST — Apr 18)</span> </p>[Resolved] Digital Workspace GPU Desktop allocation errorshttps://status.its.uq.edu.au/issues/19911/Fri, 17 Apr 2026 12:40:00 +0000https://status.its.uq.edu.au/issues/19911/2026-04-21 07:49:00<p>We currently are experiencing issues allocating resources in the Australia Azure region. This is effecting Student Desktop GPU1 and GPU2 pools. Launching a session will work intermittently. We have logged an incident with Microsoft.</p> <hr> <p><strong>Update</strong> Incident with Microsoft has been raised as this has effected GPU Azure resources in the Australia region. Microsoft have started an internal investigation. <span class="faded">(14:43 AEST — Apr 17)</span> </p> <p><strong>Resolution</strong> Services are back to normal. Root cause analysis showed that all GPU resources were consumed in the Australia Microsoft data centers on Friday the 17th of April. <span class="faded">(07:49 AEST — Apr 21)</span> </p>[Resolved] Company Portal is unable to load apps but some Intune services still work. Currently investigating with Microsoft.https://status.its.uq.edu.au/issues/19910/Tue, 14 Apr 2026 11:10:00 +0000https://status.its.uq.edu.au/issues/19910/2026-04-20 12:01:00<p>Some users of the following services may experience issues:</p> <ul> <li>Intune</li> <li>Company Portal</li> </ul> <hr> <p><strong>Resolution</strong> Outage due to a new version of the IME agent deployed by Microsoft. <span class="faded">(12:01 AEST — Apr 20)</span> </p>[Scheduled] Production database scheduled maintainencehttps://status.its.uq.edu.au/issues/19908/Mon, 13 Apr 2026 23:00:00 +0000https://status.its.uq.edu.au/issues/19908/<p>Scheduled for 2026-04-13 23:00:00 - 2026-04-14 07:00:00</p> <p>Oracle have advised that targeted Infrastructure Maintenance work is required, which impacts Production, Reports Server (Application Containers). This Outage window has been established to allow for graceful shutdown of the relevant VM instance, and to cater for the Oracle work target window and subsequent environment shakedown.</p> <hr> <p><strong>Resolution</strong> <span class="faded">(07:00 AEST — Apr 14)</span> </p>[Scheduled] Planned disruption for the OHS course content on Learn.UQ (Blackboard)https://status.its.uq.edu.au/issues/19909/Mon, 13 Apr 2026 21:00:00 +0000https://status.its.uq.edu.au/issues/19909/<p>Scheduled for 2026-04-13 21:00:00 - 2026-04-13 22:30:00</p> <p>ITS advises that the UQ Workplace Inductions and Training (OHSB0000N_0000_00000) course will not be available during Monday night while it is being updated. While this work is being carried out, student access to UQ courses will be normal. For academics only, if you update your course during this time then the automatic email notification may not be sent to students.</p> <hr> <p><strong>Resolution</strong> OHS course updates completed successfully. <span class="faded">(22:30 AEST — Apr 13)</span> </p>[Scheduled] Access switch upgrade in Cumbrae-Stewart (01-0072) TR 203Ahttps://status.its.uq.edu.au/issues/19907/Sun, 12 Apr 2026 07:00:00 +0000https://status.its.uq.edu.au/issues/19907/<p>Scheduled for 2026-04-12 07:00:00 - 2026-04-12 22:00:00</p> <ol> <li>ITS will be replacing 01-0072-203a-as02, 01-0072-203a-as03, 01-0072-203a-as04 with 2 x C9324 access switches in TR 203a.</li> </ol> <hr> <p><strong>Resolution</strong> Network upgrade completed successfully <span class="faded">(22:00 AEST — Apr 12)</span> </p>[Resolved] Company Portal unable to load appshttps://status.its.uq.edu.au/issues/19906/Thu, 02 Apr 2026 17:47:00 +0000https://status.its.uq.edu.au/issues/19906/2026-04-03 18:00:00<p>Company Portal is unable to load apps but some Intune services still work. Currently investigating with Microsoft.</p> <hr> <p><strong>Resolution</strong> The outage was caused by a service disruption on Microsoft’s end. Services were restored once Microsoft resolved the issue. <span class="faded">(18:00 AEST — Apr 3)</span> </p>[Scheduled] ARCHIBUS - upgrade to Java componentryhttps://status.its.uq.edu.au/issues/19902/Wed, 01 Apr 2026 07:30:00 +0000https://status.its.uq.edu.au/issues/19902/<p>Scheduled for 2026-04-01 07:30:00 - 2026-04-01 11:30:00</p> <p>The Archibus service will experience a brief service disruption whilst some critical system maintenance is conducted.</p> <hr> <p><strong>Resolution</strong> Upgrade to Java componentry successful. <span class="faded">(11:30 AEST — Apr 1)</span> </p>[Scheduled] Exadata Cloud @ Customer Patching - Production databaseshttps://status.its.uq.edu.au/issues/19897/Sun, 29 Mar 2026 06:00:00 +0000https://status.its.uq.edu.au/issues/19897/<p>Scheduled for 2026-03-29 06:00:00 - 2026-03-29 18:00:00</p> <p>Patch the PRN Exadata Cloud @ Customer with the latest quarterly Oracle Critical Patch Updates</p> <hr> <p><strong>Resolution</strong> <span class="faded">(18:00 AEST — Mar 29)</span> </p>[Resolved] Backup/Restore services for DBAs service impacthttps://status.its.uq.edu.au/issues/19901/Thu, 26 Mar 2026 12:40:00 +0000https://status.its.uq.edu.au/issues/19901/2026-03-26 16:58:00<p>ITS are currently investigating issues impacting the Oracle backup and restore services</p> <hr> <p><strong>Update</strong> Issues between Isilon PRN and ECS POL.</p> <p>ECS Polaris side taken off line to resolve service disruption. Further investigation to bring ECS POL back online required <span class="faded">(16:59 AEST — Mar 26)</span> </p> <p><strong>Resolution</strong> Disruption to services has been resolved. <span class="faded">(16:58 AEST — Mar 26)</span> </p>[Resolved] SCCM offline due to network issueshttps://status.its.uq.edu.au/issues/19900/Thu, 26 Mar 2026 09:44:00 +0000https://status.its.uq.edu.au/issues/19900/2026-03-30 14:04:00<p>SCCM is currently unavailable while some network traffic issues is being investigated</p> <hr> <p><strong>Resolution</strong> The SQLAG09 Availablility Group has been moved back to Prentice and this has resolved the issue. Working with Microsoft to determine why it was a problem being on the CCR network all of a sudden. <span class="faded">(14:04 AEST — Mar 30)</span> </p> <p><strong>Resolution</strong> The SQLAG09 Availablility Group used by SSCM had recently been switched to the CCR network, which is normal during patching. However, this caused SCCM to make thousands for ARP requests for the non-listening IP address. The SQLAG has been switched back to Prentice and this has resolved the issue. Working with Microsoft to determine why it was a problem being on the CCR network all of a sudden. <span class="faded">(14:04 AEST — Mar 30)</span> </p>[Scheduled] Weekly Production Migration for UniFihttps://status.its.uq.edu.au/issues/19899/Thu, 26 Mar 2026 07:00:00 +0000https://status.its.uq.edu.au/issues/19899/<p>Scheduled for 2026-03-26 07:00:00 - 2026-03-26 07:30:00</p> <p>Weekly Migration to Production.</p> <p>Refer to page below for a full list of changes, or contact <a href="mailto:eaps@uq.edu.au">eaps@uq.edu.au</a> for more information</p> <p><a href="https://uqits.atlassian.net/wiki/spaces/ESS/pages/389873665/2026-03-25+Weekly+Production+Changes+-+EA+Change+and+Release">https://uqits.atlassian.net/wiki/spaces/ESS/pages/389873665/2026-03-25+Weekly+Production+Changes+-+EA+Change+and+Release</a></p> <hr> <p><strong>Resolution</strong> <span class="faded">(07:30 AEST — Mar 26)</span> </p>[Scheduled] ARCHIBUS - upgrade to Java componentryhttps://status.its.uq.edu.au/issues/19895/Tue, 24 Mar 2026 07:30:00 +0000https://status.its.uq.edu.au/issues/19895/<p>Scheduled for 2026-03-24 07:30:00 - 2026-03-24 14:30:00</p> <p>The Archibus service will experience a brief service disruption whilst some critical system maintenance is conducted.</p> <hr> <p><strong>Resolution</strong> Archibus Java components upgraded successfully. <span class="faded">(14:30 AEST — Mar 24)</span> </p>[Resolved] The Student Management System authentication is having issueshttps://status.its.uq.edu.au/issues/19896/Sat, 21 Mar 2026 09:00:00 +0000https://status.its.uq.edu.au/issues/19896/2026-03-23 14:35:00<p>Logins to the The Student Management System are failing with a redirect issue for both staff (/admin) and students (/students).</p> <p>The admin and student sites were working on Friday and reports are that an issue occurred over the weekend.</p> <p>Students reported problems over the weekend according to Student Affairs.</p> <p>ITS staff are investigating.</p> <hr> <p><strong>Resolution</strong> Authentication and logins are now working for staff and students. <span class="faded">(14:35 AEST — Mar 23)</span> </p>[Scheduled] Control-M migration to SaaS (Helix)https://status.its.uq.edu.au/issues/19893/Sat, 21 Mar 2026 07:30:00 +0000https://status.its.uq.edu.au/issues/19893/<p>Scheduled for 2026-03-21 07:30:00 - 2026-03-21 19:30:00</p> <p>Control-M migration to SaaS (Helix).</p> <p>Includes Control-M server upgrade from 9.21 (on-prem) to 9.22 (SaaS).</p> <hr> <p><strong>Resolution</strong> <span class="faded">(19:30 AEST — Mar 21)</span> </p>[Scheduled] UQ Extend - Planned Upgrade of UQ EKS Cluster from v1.32 to v1.33, and Environment Re-sizinghttps://status.its.uq.edu.au/issues/19894/Sat, 21 Mar 2026 00:30:00 +0000https://status.its.uq.edu.au/issues/19894/<p>Scheduled for 2026-03-21 00:30:00 - 2026-03-21 02:00:00</p> <p>UQs support vendor for UQ Extend, Crystal Delta, will be conducting a planned upgrade of UQ Extends AWS EKS Cluster from v1.32 to v1.33. Additionally, some environment re-sizing will be taking place to optimise infrastructure costs.</p> <p>This upgrade and environment re-sizing will ensure that the UQ Extend platform remains secure, well supported, and aligned with the Open edX project roadmap, while optimising costs, improving performance, user experience, and long-term operational stability.</p> <hr> <p><strong>Resolution</strong> Infrastructure upgrade successful. <span class="faded">(02:00 AEST — Mar 21)</span> </p>[Scheduled] Weekly Production Migration for UniFihttps://status.its.uq.edu.au/issues/19892/Thu, 19 Mar 2026 07:30:00 +0000https://status.its.uq.edu.au/issues/19892/<p>Scheduled for 2026-03-19 07:30:00 - 2026-03-19 07:35:00</p> <p>Weekly Migration to Production. Refer to page below for a full list of changes or contact <a href="mailto:eaps@uq.edu.au">eaps@uq.edu.au</a> for more information.</p> <hr> <p><strong>Resolution</strong> <span class="faded">(07:35 AEST — Mar 19)</span> </p>[Resolved] Authentication issues to some Service Providershttps://status.its.uq.edu.au/issues/19889/Tue, 17 Mar 2026 03:30:00 +0000https://status.its.uq.edu.au/issues/19889/2026-03-17 08:00:00<p>Authentications to some Service Providers were failing during the outage period. In particular, for Service Providers which require Active Directory for group information or access control decisions. This was due to problems with underpinning infrastructure.</p> <hr> <p><strong>Resolution</strong> <span class="faded">(08:00 AEST — Mar 17)</span> </p>[Scheduled] Access switch upgrade in Cumbrae Stewart (01-0072) TR 124ahttps://status.its.uq.edu.au/issues/19888/Sun, 15 Mar 2026 07:00:00 +0000https://status.its.uq.edu.au/issues/19888/<p>Scheduled for 2026-03-15 07:00:00 - 2026-03-15 22:00:00</p> <p>ITS will be installing 2 x 9300-48UXM switches in Cumbrae Stewart (01-0072) TR 124a</p> <hr> <p><strong>Resolution</strong> <span class="faded">(22:00 AEST — Mar 15)</span> </p>[Scheduled] Weekly Production Migration for UniFihttps://status.its.uq.edu.au/issues/19886/Thu, 12 Mar 2026 07:00:00 +0000https://status.its.uq.edu.au/issues/19886/<p>Scheduled for 2026-03-12 07:00:00 - 2026-03-12 07:30:00</p> <p>Weekly Migration to Production.</p> <p>Refer to page below for a full list of changes, or contact <a href="mailto:eaps@uq.edu.au">eaps@uq.edu.au</a> for more information</p> <p><a href="https://uqits.atlassian.net/wiki/spaces/ESS/pages/389808129/2026-03-11+Weekly+Production+Changes+-+EA+Change+and+Release">https://uqits.atlassian.net/wiki/spaces/ESS/pages/389808129/2026-03-11+Weekly+Production+Changes+-+EA+Change+and+Release</a></p> <hr> <p><strong>Resolution</strong> <span class="faded">(07:30 AEST — Mar 12)</span> </p>[Resolved] HCM Data not availablehttps://status.its.uq.edu.au/issues/19887/Tue, 10 Mar 2026 09:00:00 +0000https://status.its.uq.edu.au/issues/19887/2026-03-12 13:40:00<p>Hi all,</p> <p>Due to a Workday error and the way data is extracted to the integration platform Datahub, there was a delay in HR data availability on Tuesday, 10 March 2026.</p> <p>Although the issue was resolved and the data was re-run to rebuild and distribute as normal, the process unfortunately ran longer than expected and overlapped with the next scheduled data load. This meant some key attributes did not align correctly.</p> <p>This was resolved on Wednesday, 11 March, and the data rebuild is currently underway with no further issues expected. However, until this process completes, the data view will not yet be refreshed.</p> <p>UQ Integrations are aware of the impacts and have taken precautionary measures to temporarily disable feeds to PrISM, Unitask and Si-Pass. To clarify, these systems still have data available, but it reflects a previous point in time and is therefore not fully up to date.</p> <p>For most staff with no recent changes this should not cause major issues. However, we are aware that some staff are experiencing problems accessing buildings or systems, and resolving this is our highest priority.</p> <p>We kindly ask IT Services, technical owners, and HR business contacts to work with us in directing any impacted staff to the appropriate teams for temporary assistance. Your support in helping manage enquiries and reassure staff while we resolve this is greatly appreciated.</p> <p>At this stage, we expect the issue to be resolved by 1:00 PM today, Thursday 12 March 2026.</p> <p>We apologise for the inconvenience. A full review of the original source error will be conducted once this is resolved and services return to normal.</p> <hr> <p><strong>Update</strong> Hi all,</p> <p>Please be advised that this issue is now resolved. All previously disabled integrations have been re-enabled, and all consumers will have refreshed data available according to their next scheduled run.</p> <p>We will continue to closely monitor data feeds to ensure no further issues arise. This Service Event will now be marked as resolved to communicate this to downstream stakeholders. An incident report has been raised and will be reviewed with the ITS Change Advisory Board as part of IT Incident Management procedures, pending further investigation into the root cause with Workday and OneModel.</p> <p>Any opportunities to prevent this issue in the future will be investigated and implemented where appropriate. Key learnings will also be shared with relevant stakeholders to help improve service reliability.</p> <p>Thank you,</p> <p>UQ Integration Services Team. <span class="faded">(13:51 AEST — Mar 12)</span> </p> <p><strong>Resolution</strong> Hi all,</p> <p>Please be advised that this issue is now resolved. All previously disabled integrations have been re-enabled, and all consumers will have refreshed data available according to their next scheduled run.</p> <p>We will continue to closely monitor data feeds to ensure no further issues arise. This Service Event will now be marked as resolved to communicate this to downstream stakeholders. An incident report has been raised and will be reviewed with the ITS Change Advisory Board as part of IT Incident Management procedures, pending further investigation into the root cause with Workday and OneModel.</p> <p>Any opportunities to prevent this issue in the future will be investigated and implemented where appropriate. Key learnings will also be shared with relevant stakeholders to help improve service reliability.</p> <p>Thank you,</p> <p>UQ Integration Services Team. <span class="faded">(13:40 AEST — Mar 12)</span> </p>[Scheduled] Access switch upgrade - Chaplaincy TR 111https://status.its.uq.edu.au/issues/19884/Sat, 07 Mar 2026 09:00:00 +0000https://status.its.uq.edu.au/issues/19884/<p>Scheduled for 2026-03-07 09:00:00 - 2026-03-07 15:00:00</p> <p>ITS will be replacing 01-0038-111-as01 (2 xC3750G-24PS), 01-0038-111-as02 (1 xC2960S-24PD) with 1 x 9300-48UXM access switches in TR 111. Connect new 01-0038-111-as01 to the Agg routers for uplink. Repatch replacement switch to end devices and configure</p> <hr> <p><strong>Resolution</strong> Network upgrade completed successfully without issue. <span class="faded">(15:00 AEST — Mar 7)</span> </p>[Scheduled] Blackboard Learning Pathway maintenancehttps://status.its.uq.edu.au/issues/19879/Fri, 06 Mar 2026 23:00:00 +0000https://status.its.uq.edu.au/issues/19879/<p>Scheduled for 2026-03-06 23:00:00 - 2026-03-07 01:00:00</p> <p>The Learn.UQ (Blackboard) Learning Pathway integrations will be unavailable for a period of 2 hours while the vendor performs necessary maintenance.</p> <hr> <p><strong>Resolution</strong> Vendor maintenance complete. <span class="faded">(01:00 AEST — Mar 7)</span> </p>[Resolved] UQ Book It resources not loadinghttps://status.its.uq.edu.au/issues/19883/Thu, 05 Mar 2026 14:13:00 +0000https://status.its.uq.edu.au/issues/19883/2026-03-06 01:15:00<p>UQ Book It is experiencing issues with resources loading. The vendor has been contacted to investigate.</p> <hr> <p><strong>Update</strong> From the vendor: We are continuing to investigate the issue impacting Resource Booker. Our teams have identified the current behaviour and are actively working to determine the underlying cause and appropriate resolution. <span class="faded">(16:30 AEST — Mar 5)</span> </p> <p><strong>Resolution</strong> - Looking at the server internally, HTTP 400 Bad Request errors were occurring. These related to the search service in the cloud. Attempt to rebuild indexes failed. A new search service was spun up and linked to the Resource Booker sites.</p> <p>Permanent solution/Preventive actions:</p> <ul> <li>Recreated search services <span class="faded">(01:15 AEST — Mar 6)</span> </li> </ul>[Resolved] Multiple VMs impacted due to fault with VM Host in CCRhttps://status.its.uq.edu.au/issues/19882/Thu, 05 Mar 2026 09:18:00 +0000https://status.its.uq.edu.au/issues/19882/2026-03-05 16:46:00<p>One VM Host has an unhealthy disk, causing high congestion on the node which will impact VMs and data accessed on this node.</p> <p>ITS are investigating and P1 raised with vendors.</p> <hr> <p><strong>Resolution</strong> Host returned to a healthy state <span class="faded">(16:46 AEST — Mar 5)</span> </p>[Resolved] Multiple VMs impacted due to fault with VM Host in CCRhttps://status.its.uq.edu.au/issues/19881/Wed, 04 Mar 2026 14:00:00 +0000https://status.its.uq.edu.au/issues/19881/2026-03-04 15:06:00<p>VMs have been impacted on one of the hosts by high disk latency. This host has been put into maintenance, and vms migrated to fuctional hosts.</p> <hr> <p><strong>Update</strong> Impacted VM&rsquo;s have been migrated from the affected host.</p> <p>Rest of data evacuation from hosts is underway. <span class="faded">(15:24 AEST — Mar 4)</span> </p> <p><strong>Resolution</strong> VM&rsquo;s have been migrated from the affected host which will move into maintenance mode for disk replacement.</p> <p>VM&rsquo;s requiring restarts have been restarted. <span class="faded">(15:06 AEST — Mar 4)</span> </p>[Resolved] Users may be unable to access various M365 Apps or services from portal.office.comhttps://status.its.uq.edu.au/issues/19878/Mon, 02 Mar 2026 10:47:00 +0000https://status.its.uq.edu.au/issues/19878/2026-03-02 14:54:00<p>Some users may be unable to access various Microsoft 365 Apps or services from portal.office.com. This is impacting users across Australia.</p> <p>Please note that access to M365 services via normal desktop applications remains unaffected.</p> <hr> <p><strong>Update</strong> Title: Users in Australia may be unable to access various Microsoft 365 Apps or services from portal.office.com</p> <p>User impact: Users may be unable to access various Microsoft 365 Apps or services from portal.office.com.</p> <p>More info: This issue affects users accessing apps or services from portal.office.com and m365.cloud.microsoft.com.</p> <p>Current status: We investigated service health telemetry and identified resource contention caused by a spike in demand on infrastructure that facilitates access to Microsoft 365 apps and services through the portal. This reduced the rate at which user requests were processed, leading to impact. We’ve implemented configuration changes to improve service accessibility. We’re seeing improvements in service health and are validating with a subset of affected users to confirm resolution.</p> <p>Scope of impact: Users in Australia attempting to access or use Microsoft 365 Apps and services may be impacted. This section may be updated as our investigation continues.</p> <p>Root cause: A resource contention caused by a spike in demand on infrastructure that facilitates access to Microsoft 365 apps and services through the portal. This reduced the rate at which user requests were processed, leading to impact.</p> <p>Next update by: Monday, 2 March 2026 at 15:30 GMT+10 <span class="faded">(13:39 AEST — Mar 2)</span> </p> <p><strong>Resolution</strong> Final status: Microsoft have confirmed with a subset of reporting users, as well as theur internal telemetry that service health is stable and impact has been remediated.</p> <p>Scope of impact: Users in Australia attempting to access or use Microsoft 365 Apps and services may have been impacted.</p> <p>Start time: Monday, 2 March 2026 at 07:30 GMT+10</p> <p>End time: Monday, 2 March 2026 at 12:30 GMT+10</p> <p>Root cause: A resource contention caused by a spike in demand on infrastructure that facilitates access to Microsoft 365 Apps and services through the portal. This reduced the rate at which user requests were processed, which led to impact.</p> <p>Next steps:</p> <ul> <li>Microsoft are further analyzing their service telemetry to help identify the underlying root cause of the spike in demand, as well as assessing whether additional monitoring can be implemented to help better detect similar issues in the future.</li> </ul> <p>This is the final update for the event. <span class="faded">(15:11 AEST — Mar 2)</span> </p> <p><strong>Resolution</strong> Final status: Microsoft have confirmed with a subset of reporting users, as well as theur internal telemetry that service health is stable and impact has been remediated.</p> <p>Scope of impact: Users in Australia attempting to access or use Microsoft 365 Apps and services may have been impacted.</p> <p>Start time: Monday, 2 March 2026 at 07:30 GMT+10</p> <p>End time: Monday, 2 March 2026 at 12:30 GMT+10</p> <p>Root cause: A resource contention caused by a spike in demand on infrastructure that facilitates access to Microsoft 365 Apps and services through the portal. This reduced the rate at which user requests were processed, which led to impact.</p> <p>Next steps:</p> <ul> <li>Microsoft are further analyzing their service telemetry to help identify the underlying root cause of the spike in demand, as well as assessing whether additional monitoring can be implemented to help better detect similar issues in the future.</li> </ul> <p>This is the final update for the event. <span class="faded">(14:54 AEST — Mar 2)</span> </p>[Resolved] Service availability issues with the M365 CoPilot web apphttps://status.its.uq.edu.au/issues/19877/Mon, 02 Mar 2026 09:16:00 +0000https://status.its.uq.edu.au/issues/19877/2026-03-24 14:30:00<p>Some users may be unable to access or use the Microsoft Copilot Chat web app.</p> <p>Users in Australia attempting to access or use the Microsoft Copilot Chat web app may be impacted. Microsoft are reviewing the provided impact details and investigating.</p> <hr> <p><strong>Resolution</strong> Transient issues resolved. <span class="faded">(14:30 AEST — Mar 24)</span> </p>[Resolved] VPN Services - Reduced Availabilty - Only VPN4 availablehttps://status.its.uq.edu.au/issues/19874/Sun, 01 Mar 2026 13:00:00 +0000https://status.its.uq.edu.au/issues/19874/2026-03-01 17:53:00<p>VPN Services are currently impacted by service disruption.</p> <p>uq-vpn4.router.uq.edu.au is the only vpn server availabe and can be selected manually at the VPN logon prompt.</p> <p>ITS Staff are currently investigating.</p> <hr> <p><strong>Resolution</strong> VPN Services restored <span class="faded">(17:53 AEST — Mar 1)</span> </p> Unwanted Add-ins and Add-in issues in M365https://status.its.uq.edu.au/issues/19890/Sun, 01 Mar 2026 11:34:00 +0000https://status.its.uq.edu.au/issues/19890/<p>There are reporting issues with Addin in Microsoft 365. A new support ticket will be logged with Microsoft. This seems to be similar to the issues from October 2025 which were claimed to be resolved around December 2025.</p> <p>Some of the report issues include:</p> <ol> <li> <p>The following add-ins appears in Outlook without the user choosing to install these addins Jira Cloud Impact Tracker Wrike Salesforce</p> </li> <li> <p>Unable to uninstall the Addin like Impact Tracker</p> </li> <li> <p>Issue with the Zoom Addin in Outlook.</p> </li> <li> <p>Issues with Add-ins like Mendeley Cite not deploying to Word when a user is added. .</p> </li> </ol> <p>We are working with Microsoft on the issues.</p>