Scheduled for 2026-05-24 09:00:00 - 2026-05-24 19:00:00
ITS will be installing 1 x 9407/2 access switches into rack A 29-8101 TR202a and 2 x 32A PDUs at front of rack connected to 2x 32A power drop down pendants.
Resolution Access switch upgrade has been completed successfully (19:00 AEST — May 24)
Last updated: 24 May, 2026 at 9:00 AM AEST