← Go back to UQ Status

[Scheduled] JD Story 01-0061 TR502 - Access Switches Upgrade

5 September, 2026 at 6:00 AM AEST

Network Upgrade Project


Scheduled for 2026-09-05 06:00:00 - 2026-09-05 22:00:00

  1. Install 1x C9407R into rack A in 01-0061 TR502.
  2. Connect new 01-0061-502-as01 to the Agg routers
  3. Install and connect the new 2x32A power supplies to the chassis.
  4. Patch and configure.

Last updated: 5 September, 2026 at 6:00 AM AEST