← Go back to UQ Status

[Scheduled] Access Switches Upgrade - Michie 01-0009 TR115 and Duhig 01-0002 TR d701

27 September, 2026 at 7:00 AM AEST

Network Upgrade Project


Scheduled for 2026-09-27 07:00:00 - 2026-09-27 22:00:00

ITS will be installing 2 x C9348 access switches into rack A 01-0009 TR115 and 1 x C9348 access switches into rack A 01-0002 TR d701.

Last updated: 27 September, 2026 at 7:00 AM AEST